Rhinoceros complete the repair and repainting of parapet railings and timbers at Windmill Road Pedestrian and Equestrian subway. This work included the replacement of defective timber followed by sanding down to sound wood the existing timber rails, the stripping back to sound clean metal coating of all posts. All timber has been coated with 3 coats of Sikkens Cetol Woodstain which should last in excess of 7 years. Steel posts have been primed with Sigmacover 280 epoxy primer and finished with SigmaDur 550 two pack polyurethane in BS colour 14 C 40.