Rhinoceros started work on 14 June. The original coating system has failed on the 10m galvanised steel power line supporting poles. We are removing the existing coatings with a methylene chloride based paint stripper. This eliminates contamination of the environment and operatives from dust. Once cleaned down to clean metal coating we applied a T-wash. This is followed by a high build aluminium primer HA item 115 from Dacrylate Paints of Nottingham. The undercoat is HA item 116 high build epoxy undercoat also by Dacrylate. The finish coating in NET Silver is a polysiloxane AGS coating manufactured by Dacrylate Paints.